Wearable tracking device manufacturing at NexPCB keeps location, runtime, and the enclosure as three separate acceptance lines. Two runtime numbers cannot be set side by side until each one names whether the receiver was on continuously or in intervals, how the position was sent, and where the device was mounted. Comparing cell capacity alone compares the wrong thing.
| Line | Written next to the result | Figure from the build |
|---|---|---|
| Location | Signal-to-noise from three placements on that program: under a repeater, on a far table, and in a tray with the lid on. This is a signal check, not the full location acceptance | A weak fix brought back by a defined pose and a tighter work instruction |
| Runtime | The watch standby estimate. It is not the swim band and it is not a worn or reporting measurement | About 4.7 mA at 3.7 V on a 250 mAh cell, about two days under that standby condition |
| Enclosure | Waterproof record on the swim-safety strap, and antenna clearance on a different tracker | IP67 on that strap, one meter for 30 minutes. A few millimeters between two antennas on the tracker |
The signal check on that program is the placement reading. Runtime is accepted only with the condition the charge section names. The enclosure record stays on the product that recorded the waterproof result, and the antenna gap stays on the tracker that measured it. A blocked signal on that tracker sends its runtime back into retries. It does not rewrite the watch's standby estimate.
Location on the program that set this method was a signal check: the signal-to-noise ratio read from three units, under a repeater, on a far table, and in a tray with the lid on. The client for this project read the three values remotely. A weak satellite fix on that program was a formal functional check. That check is not the full location acceptance for every tracking device.
On a volume build, a weak fix was brought back by a defined pose and a tighter work instruction.
The charge those fixes spend is the next line. The three lines stay separate: location, runtime, and the enclosure. The desk photograph shows the device. It is not a satellite test site.
Three actions spend the charge before the enclosure is even closed. Each new fix turns the receiver on. Whether that step runs continuously or in intervals, and whether the radio is sending while it runs, belongs in the same line, because the charge is not the same in those states. Sending the position usually spends more than the fix. A shorter reporting interval keeps the device awake longer, so the same cell lasts fewer days.
The acceptance line for runtime therefore names which of the three was running, and the interval. A housing that blocks the signal makes the device try again, and the runtime falls with those retries. Mounting position belongs in the same line.
The number that goes on the acceptance line has to carry that condition with it.
Runtime carries the condition it was estimated or measured under. On the watch program, standby was about 4.7 mA at 3.7 V against a 250 mAh cell, about two days. That figure is a theoretical estimate for the standby condition on that watch. It is not a worn, locating, or reporting measurement, and it is not the swim band's runtime. The acceptance line is the number plus the condition that produced it. Centimeter-level accuracy, where a product states it, stays on that product and that condition. It is not this watch figure.
The enclosure is the third line. A housing that blocks the signal sends this runtime back into retries.
On a swim-safety strap the recorded result was IP67, one meter for 30 minutes, built with a marine epoxy and a structural adhesive. The final target on that program was IP68, so the file holds the IP67 record from that build. IP67 and IP68 name enclosure codes in IEC 60529.
The enclosure check on a tracker has three steps. Confirm the housing closes. Confirm the antenna is not covered by metal once the device is mounted. Then measure the gap between antennas that have to coexist. One tracker had only a few millimeters between the cellular antenna and the positioning antenna. Too little clearance on that tracker hurt the low-frequency performance. That gap belongs to that tracker. It is not the watch and it is not the swim band. We design the enclosure and the antenna placement together, because the housing changes the RF result (wearable solutions). The enclosure record is part of what is frozen before volume on the builds that use that gate. Production delivery starts from the record that holds the three lines for that project.
The location check on the program above is a signal-to-noise reading from the placements that project used. It is not the full location acceptance. The runtime number names its condition. The 4.7 mA figure is the watch standby estimate. The enclosure has its waterproof record on the product that recorded it, and the antenna clearance stays on the tracker that measured it.
A manual that states a fix time and centimeter-level accuracy states that product's capability under the condition the manual names. The line check on the program above is the signal-to-noise reading under the placement that project defined. The two are not the same result.
Bring the location condition you will accept, the runtime condition, including the reporting interval, and the waterproof target, and say how close the housing comes to the antenna. If a pose or a work instruction already fixed a weak reading, send that. The enclosure file comes across after a non-disclosure agreement. Start at our project inquiry form.